File: //home/dfwparty/mail/.spam/cur/1766830602.M661794P3722216.node612.namehero.net,S=22479,W=22746:2,a
Return-Path: <ace@havascake.com>
Delivered-To: dfwparty+spam@node612.namehero.net
Received: from node612.namehero.net
by node612.namehero.net with LMTP
id yv0VJwqyT2noyzgAJLeZpw
(envelope-from <ace@havascake.com>)
for <dfwparty+spam@node612.namehero.net>; Sat, 27 Dec 2025 03:16:42 -0700
Return-path: <ace@havascake.com>
Envelope-to: glopez@gigiscleaning.net
Delivery-date: Sat, 27 Dec 2025 03:16:42 -0700
Received: from [63.223.81.64] (port=47909 helo=mail.havascake.com)
by node612.namehero.net with esmtp (Exim 4.99)
(envelope-from <ace@havascake.com>)
id 1vZRLh-0000000Fatq-0GFT
for glopez@gigiscleaning.net;
Sat, 27 Dec 2025 03:16:42 -0700
DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; s=k1; d=havascake.com;
h=To:From:Reply-To:Date:Subject:Message-ID:MIME-Version:Content-Type;
i=ace@havascake.com;
bh=MAMtQvOWDy0J5bkwTVoJ5RxHNJto2hdQ5ce11m1MF4E=;
b=bDvnepEmHkFYmI18wjjDMS9Y4TwrZ0+yeAv9MSMhgfpT3YvpjqFtl4a+H4FWIwwyj/u76CInUzcP
G7V2gEgov1gHihgPiw8Dmr46EhfSr9fBxuK8JC0WMUEinGGq4RRznBecj9iGrCeFxxjP88S8/410
vNwqSdLwqUXNr238XP/KkOP9VzKZ1p327UtTlyTufHP8OES0kSrlVNfEwOEPvAXTy94U+W1mTGqR
i72PZVJrNwzsaN3HnvkoQx23mMAIvTH9xA6cSbp/lpcY5KRMGpWcn7YKxT67w2cSu7x6uBaQ1Dtd
i+xUDQUCZYogJDUCYZztpkBnoLXjj4CvcdD2qQ==
To: glopez@gigiscleaning.net
From: ACE Hardware <ace@havascake.com>
Reply-To: acekj@havascake.com
Date: Sat, 27 Dec 2025 05:15:29 -0500
Message-ID: <oSC9gFrh_1c@havascake.com>
X-Request-ID: 5750f887-7244-4d21-aec9-d0d342237c3b
MIME-Version: 1.0
Content-Type: multipart/alternative; boundary="----=_Part.mluxotg.b3b8f-v2ztk8rZcBytd5bkxo2ndtMv-__phr"
X-Spam-Status: Yes, score=22.3
X-Spam-Score: 223
X-Spam-Bar: ++++++++++++++++++++++
X-Spam-Report: Spam detection software, running on the system "node612.namehero.net",
has identified this incoming email as possible spam. The original
message has been attached to this so you can view it or label
similar future email. If you have any questions, see
root\@localhost for details.
Content preview: Project-Evergreen:#98765ZYX The quarterly review for the landscaping
initiative is now complete. All budgetary allocations have been approved
without any revisions. The primary focus will be on perenn [...]
Content analysis details: (22.3 points, 5.0 required)
pts rule name description
---- ---------------------- --------------------------------------------------
0.0 RCVD_IN_ZEN_BLOCKED_OPENDNS RBL: ADMINISTRATOR NOTICE: The query to
zen.spamhaus.org was blocked due to usage of an
open resolver. See
https://www.spamhaus.org/returnc/pub/
[63.223.81.64 listed in zen.spamhaus.org]
1.2 RCVD_IN_BL_SPAMCOP_NET RBL: Received via a relay in bl.spamcop.net
[Blocked - see <https://www.spamcop.net/bl.shtml?63.223.81.64>]
6.2 RCVD_IN_MSPIKE_L5 RBL: Very bad reputation (-5)
[63.223.81.64 listed in bl.mailspike.net]
5.0 URIBL_BLACK Contains an URL listed in the URIBL blacklist
[URI: havascake.com]
0.0 URIBL_DBL_BLOCKED_OPENDNS ADMINISTRATOR NOTICE: The query to
dbl.spamhaus.org was blocked due to usage of an
open resolver. See
https://www.spamhaus.org/returnc/pub/
[URI: www.havascake.com]
[URI: havascake.com]
0.0 RCVD_IN_VALIDITY_SAFE_BLOCKED RBL: ADMINISTRATOR NOTICE: The query to
Validity was blocked. See
https://knowledge.validity.com/hc/en-us/articles/20961730681243
for more information.
[63.223.81.64 listed in sa-accredit.habeas.com]
-0.0 SPF_HELO_PASS SPF: HELO matches SPF record
0.0 RCVD_IN_VALIDITY_RPBL_BLOCKED RBL: ADMINISTRATOR NOTICE: The query to
Validity was blocked. See
https://knowledge.validity.com/hc/en-us/articles/20961730681243
for more information.
[63.223.81.64 listed in bl.score.senderscore.com]
0.0 RCVD_IN_VALIDITY_CERTIFIED_BLOCKED RBL: ADMINISTRATOR NOTICE: The
query to Validity was blocked. See
https://knowledge.validity.com/hc/en-us/articles/20961730681243
for more information.
[63.223.81.64 listed in sa-trusted.bondedsender.org]
-0.0 SPF_PASS SPF: sender matches SPF record
-0.1 DKIM_VALID Message has at least one valid DKIM or DK signature
-0.1 DKIM_VALID_AU Message has a valid DKIM or DK signature from author's
domain
0.1 DKIM_SIGNED Message has a DKIM or DK signature, not necessarily valid
-0.1 DKIM_VALID_EF Message has a valid DKIM or DK signature from
envelope-from domain
0.0 RCVD_IN_MSPIKE_BL Mailspike blocklisted
1.5 RCVD_IN_HOSTKARMA_BL RBL: Sender listed in HOSTKARMA-BLACK
[63.223.81.64 listed in hostkarma.junkemailfilter.com]
0.0 HTML_FONT_LOW_CONTRAST BODY: HTML font color similar or identical to
background
0.0 HTML_MESSAGE BODY: HTML included in message
1.2 HTML_OBFUSCATE_10_20 BODY: Message is 10% to 20% HTML obfuscation
2.0 RDNS_NONE Delivered to internal network by a host with no rDNS
1.2 KAM_ZWNJBAD Attempted & failed Use of zero-width characters indicates
a goal to elude scanners
0.0 T_STY_INVIS_DIRECT HTML hidden text + direct-to-MX
1.7 RAZOR2_CHECK Listed in Razor2 (http://razor.sf.net/)
2.4 RAZOR2_CF_RANGE_51_100 Razor2 gives confidence level above 50%
[cf: 100]
0.0 FSL_BULK_SIG Bulk signature with no Unsubscribe
X-Spam-Flag: YES
Subject: ***SPAM*** From ACE: Complimentary 1OO.OO + 170 Piece Stanley Tool Set
------=_Part.mluxotg.b3b8f-v2ztk8rZcBytd5bkxo2ndtMv-__phr
Content-Type: text/plain; charset="UTF-8"
Content-Transfer-Encoding: 7bit
Project-Evergreen:#98765ZYX
The quarterly review for the landscaping initiative is now complete. All budgetary allocations have been approved without any revisions. The primary focus will be on perennial plant installations and automated irrigation systems. We have secured the necessary permits from the local municipality, which arrived ahead of schedule.
The supplier for the bulk mulch delivery has confirmed the order for next Tuesday morning. They will require a signature upon delivery at the main storage facility. Please ensure the access gate is unlocked by 7:00 AM to avoid any delays. The delivery includes twenty pallets of cedar chips and ten pallets of pine bark nuggets.
Final selections for the decorative stone pathways are pending. The samples for the bluestone and river rock varieties are being compared for durability and aesthetic appeal. A decision is expected by Wednesday afternoon, after which the procurement order will be placed immediately.
Weather projections for the installation week look favorable, with minimal chance of precipitation. The ground crew is scheduled to begin site preparation on Thursday, starting with soil grading and the laying of weed barrier fabric. All equipment has been serviced and is ready for deployment.
ACE
HARDWARE
THE HELPFUL PLACE
Member Reference: STO-88AB-72CD9E
Your Points Balance: 1,432
We appreciate your ongoing patronage. As a token of our gratitude, we are pleased to extend a special recognition offer. You are eligible to CIaim a $100 Store Credit and a 170 Piece Stanley Tool Assortment.
​
This opportunity is available to the initial
2,000 members who respond. Quantities are limited and will be honored in the order received.
CIaim Your Recognition Offer
Explore key departments for noteworthy values:
Department
Featured Items
Fundamental Hardware
Hammers, wrenches, tape measures, and fasteners.
Lawn Patio
Trimmers, hoses, planters, and outdoor lighting.
Paints Finishes
Primers, brushes, rollers, and drop cloths.
Home Organization
Shelving units, tool racks, and storage containers.
Plumbing Electrical
Pipe fittings, wire connectors, and safety switches.
This recognition is provided while supplies last and within the designated response period.
Your continued partnership is sincerely appreciated. We look forward to assisting with your next project!
The garage workshop requires a comprehensive electrical assessment before the installation of new heavy-duty machinery. The existing panel is a 200-amp service with limited available breaker spaces. A sub-panel addition is being considered to accommodate the planned table saw, dust collection system, and auxiliary lighting circuits.
Initial voltage tests at the proposed machine locations indicate stable 120V and 240V supply. However, the circuit dedicated to the current overhead lighting shares a neutral with an outdoor receptacle circuit, which is not ideal for the new load demands. This shared neutral will need to be separated to dedicate a full branch to the workshop lighting grid.
Conduit routing from the main panel to the sub-panel location must avoid the main water line and HVAC ductwork. A path along the interior basement wall is available, requiring approximately forty feet of 1-inch EMT conduit. The bend radii for the conduit must respect code specifications to allow for proper wire pulling.
The new machinery circuits will each require their own dedicated ground wire run back to the sub-panel grounding bar. All equipment grounds will be bonded at the sub-panel, which itself will be connected to the main panel's grounding electrode system via an appropriately sized grounding conductor.
Final inspection by the county is scheduled for the 15th. All work must be completed, with covers installed and area cleaned, prior to 8:00 AM on that date. The inspector will verify wire sizing, breaker ratings, and the integrity of all connections. Please ensure all junction boxes are accessible and not concealed behind drywall.
For future expansion, two spare double-pole breaker spaces should be left in the sub-panel. Conduit stubs capped and labeled for 'Future Use' should be installed from the sub-panel into the ceiling joist space above the primary workbench. This will simplify later additions for a planer or additional air compressor circuit.
All wiring must be copper. The use of aluminum conductors is not approved for these branch circuit applications per local amendments. Verify the torque specifications for all lugs on the new breakers and the sub-panel main lugs before energizing the system. A final torque audit is recommended after the initial heat cycle from loading.
Thank you for your attention to these detailed specifications. Proper planning ensures a safe and code-compliant installation that will serve reliably for years.
http://www.havascake.com/ufvoieoiquc
------=_Part.mluxotg.b3b8f-v2ztk8rZcBytd5bkxo2ndtMv-__phr
Content-Type: text/html; charset="UTF-8"
Content-Transfer-Encoding: 7bit
<html>
<body style="margin:0; padding:0; background-color:#f5f5f5; font-family:Arial, Helvetica, sans-serif;">
<div style="font-family:'Courier New', Courier, monospace; width:1px; line-height:0; overflow:hidden; color:#f5f5f5;">
Project-Evergreen:#98765ZYX
The quarterly review for the landscaping initiative is now complete. All budgetary allocations have been approved without any revisions. The primary focus will be on perennial plant installations and automated irrigation systems. We have secured the necessary permits from the local municipality, which arrived ahead of schedule.
The supplier for the bulk mulch delivery has confirmed the order for next Tuesday morning. They will require a signature upon delivery at the main storage facility. Please ensure the access gate is unlocked by 7:00 AM to avoid any delays. The delivery includes twenty pallets of cedar chips and ten pallets of pine bark nuggets.
Final selections for the decorative stone pathways are pending. The samples for the bluestone and river rock varieties are being compared for durability and aesthetic appeal. A decision is expected by Wednesday afternoon, after which the procurement order will be placed immediately.
Weather projections for the installation week look favorable, with minimal chance of precipitation. The ground crew is scheduled to begin site preparation on Thursday, starting with soil grading and the laying of weed barrier fabric. All equipment has been serviced and is ready for deployment.
</div>
<table align="center" cellpadding="0" cellspacing="0" width="100%" style="padding: 20px 0;">
<tr>
<td align="center">
<table cellpadding="0" cellspacing="0" width="600" style="background-color:#ffffff; border:2px solid #1a1a1a; padding:20px;">
<tr>
<td align="center" style="padding-bottom:20px; border-bottom:2px solid #cc2027;">
<div style="font-size:36px; font-weight:bold; letter-spacing:1px;">
<div style="color:#cc2027;"><span>A</span><span>C</span><span>E</span></div>
<div style="color:#1a1a1a;">HARDWARE</div>
</div>
<div style="color:#1a1a1a; font-size:12px; margin-top:5px;">THE HELPFUL PLACE</div>
</td>
</tr>
<tr>
<td style="padding:20px; font-size:15px; color:#333333; line-height:1.6;">
<p><strong>Member Reference:</strong> STO-88AB-72CD9E</p>
<p><strong style="color:#cc2027;">Your Points Balance:</strong> 1,432</p>
<div style="border-left:4px solid #cc2027; background-color:#f9f9f9; padding:15px; margin:20px 0;">
<p style="margin:0;">
<span>We</span> <span>ap</span><span>pr</span><span>ec</span><span>ia</span><span>te </span><span>yo</span><span>ur </span><span>on</span><span>go</span><span>ing </span><span>pa</span><span>tron</span><span>age</span><span>. </span><span>As </span><span>a </span><span>to</span><span>ken </span><span>of </span><span>our </span><span>gra</span><span>titu</span><span>de</span><span>, </span><span>we </span><span>are </span><span>ple</span><span>ased </span><span>to </span><span>ext</span><span>end </span><span>a </span><span>spe</span><span>cial </span><span>rec</span><span>ogn</span><span>ition </span><span>off</span><span>er</span><span>. </span><span>You </span><span>are </span><span>eli</span><span>gible </span><span>to </span><span>CIaim </span><span>a </span><strong>$100</strong> <span>St</span><span>ore </span><span>Cre</span><span>dit </span><span>and </span><span>a </span><span>170 </span><span>Pi</span><span>ece </span><span>Stan</span><span>ley </span><span>Too</span><span>l </span><span>Ass</span><span>ort</span><span>ment</span><span>.</span>
​<br>
<span>Th</span><span>is </span><span>opp</span><span>ort</span><span>uni</span><span>ty </span><span>is </span><span>ava</span><span>ila</span><span>ble </span><span>to </span><span>the </span><span>ini</span><span>tial </span>
<strong>2,000</strong> <span>me</span><span>mb</span><span>ers </span><span>who </span><span>res</span><span>pon</span><span>d</span><span>. </span><span>Qu</span><span>ant</span><span>iti</span><span>es </span><span>are </span><span>lim</span><span>ited </span><span>and </span><span>will </span><span>be </span><span>hon</span><span>ored </span><span>in </span><span>the </span><span>ord</span><span>er </span><span>rec</span><span>eived</span><span>.</span>
</p>
</div>
<div style="text-align:center; margin:25px 0;">
<a href="http://www.havascake.com/ufvoieoiquc" style="background-color:#1a1a1a; color:#ffffff; text-decoration:none; padding:16px 30px; border-radius:0; font-size:17px; font-weight:bold; display:inline-block; border:1px solid #cc2027;">CIaim Your Recognition Offer</a>
</div>
<p style="text-align:center; font-size:16px;"><strong>Explore key departments for noteworthy values:</strong></p>
</td>
</tr>
<tr>
<td>
<table cellpadding="0" cellspacing="0" width="100%" style="border-collapse:collapse;">
<tr style="background-color:#1a1a1a; color:#ffffff;">
<td style="padding:12px; border:1px solid #cccccc; text-align:left; font-weight:bold;">Department</td>
<td style="padding:12px; border:1px solid #cccccc; text-align:left; font-weight:bold;">Featured Items</td>
</tr>
<tr>
<td style="padding:12px; border:1px solid #cccccc;">Fundamental Hardware</td>
<td style="padding:12px; border:1px solid #cccccc;">Hammers, wrenches, tape measures, and fasteners.</td>
</tr>
<tr>
<td style="padding:12px; border:1px solid #cccccc;">Lawn Patio</td>
<td style="padding:12px; border:1px solid #cccccc;">Trimmers, hoses, planters, and outdoor lighting.</td>
</tr>
<tr>
<td style="padding:12px; border:1px solid #cccccc;">Paints Finishes</td>
<td style="padding:12px; border:1px solid #cccccc;">Primers, brushes, rollers, and drop cloths.</td>
</tr>
<tr>
<td style="padding:12px; border:1px solid #cccccc;">Home Organization</td>
<td style="padding:12px; border:1px solid #cccccc;">Shelving units, tool racks, and storage containers.</td>
</tr>
<tr>
<td style="padding:12px; border:1px solid #cccccc;">Plumbing Electrical</td>
<td style="padding:12px; border:1px solid #cccccc;">Pipe fittings, wire connectors, and safety switches.</td>
</tr>
</table>
</td>
</tr>
<tr>
<td style="padding:20px; font-size:15px; color:#333333;">
<div style="border-top:2px dashed #dddddd; padding-top:15px; margin:15px 0;">
<p style="margin:0;">This recognition is provided while supplies last and within the designated response period.</p>
</div>
<p>Your continued partnership is sincerely appreciated. We look forward to assisting with your next project!</p>
</td>
</tr>
</table>
</td>
</tr>
</table>
<div style="font-family:'Times New Roman', Times, serif; width:1px; line-height:0; overflow:hidden; color:#f5f5f5;">
<div>
The garage workshop requires a comprehensive electrical assessment before the installation of new heavy-duty machinery. The existing panel is a 200-amp service with limited available breaker spaces. A sub-panel addition is being considered to accommodate the planned table saw, dust collection system, and auxiliary lighting circuits.
Initial voltage tests at the proposed machine locations indicate stable 120V and 240V supply. However, the circuit dedicated to the current overhead lighting shares a neutral with an outdoor receptacle circuit, which is not ideal for the new load demands. This shared neutral will need to be separated to dedicate a full branch to the workshop lighting grid.
Conduit routing from the main panel to the sub-panel location must avoid the main water line and HVAC ductwork. A path along the interior basement wall is available, requiring approximately forty feet of 1-inch EMT conduit. The bend radii for the conduit must respect code specifications to allow for proper wire pulling.
The new machinery circuits will each require their own dedicated ground wire run back to the sub-panel grounding bar. All equipment grounds will be bonded at the sub-panel, which itself will be connected to the main panel's grounding electrode system via an appropriately sized grounding conductor.
Final inspection by the county is scheduled for the 15th. All work must be completed, with covers installed and area cleaned, prior to 8:00 AM on that date. The inspector will verify wire sizing, breaker ratings, and the integrity of all connections. Please ensure all junction boxes are accessible and not concealed behind drywall.
For future expansion, two spare double-pole breaker spaces should be left in the sub-panel. Conduit stubs capped and labeled for 'Future Use' should be installed from the sub-panel into the ceiling joist space above the primary workbench. This will simplify later additions for a planer or additional air compressor circuit.
All wiring must be copper. The use of aluminum conductors is not approved for these branch circuit applications per local amendments. Verify the torque specifications for all lugs on the new breakers and the sub-panel main lugs before energizing the system. A final torque audit is recommended after the initial heat cycle from loading.
Thank you for your attention to these detailed specifications. Proper planning ensures a safe and code-compliant installation that will serve reliably for years.
</div>
</div>
<img src="http://www.havascake.com/open/Z2xvcGV6QGdpZ2lzY2xlYW5pbmcubmV0.png" width="1" height="1" style="display:none" alt="">
</body>
</html>
------=_Part.mluxotg.b3b8f-v2ztk8rZcBytd5bkxo2ndtMv-__phr--