File: //home/dfwparty/mail/.spam/cur/1767244159.M330514P1656347.node612.namehero.net,S=21126,W=21377:2,a
Return-Path: <hsa1k@shikofilm.com>
Delivered-To: dfwparty+spam@node612.namehero.net
Received: from node612.namehero.net
by node612.namehero.net with LMTP
id kkJYE38BVmkbRhkAJLeZpw
(envelope-from <hsa1k@shikofilm.com>)
for <dfwparty+spam@node612.namehero.net>; Wed, 31 Dec 2025 22:09:19 -0700
Return-path: <hsa1k@shikofilm.com>
Envelope-to: glopez@gigiscleaning.net
Delivery-date: Wed, 31 Dec 2025 22:09:19 -0700
Received: from [63.223.81.226] (port=49223 helo=mail.shikofilm.com)
by node612.namehero.net with esmtp (Exim 4.99)
(envelope-from <hsa1k@shikofilm.com>)
id 1vbAvy-00000006vUW-3qAW
for glopez@gigiscleaning.net;
Wed, 31 Dec 2025 22:09:19 -0700
DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; s=k1; d=shikofilm.com;
h=From:Reply-To:To:Date:Subject:Message-ID:MIME-Version:Content-Type;
i=hsa1k@shikofilm.com;
bh=pjp29z8gH5j90kGUov+ciPTvcAigQLjxfsQzjqwVXWM=;
b=OvgbhvMqlGwfWaurURJ0Hxuxgj42M8j8yNTIQwQAB1gXksz4k3ulxCqAB/QDQv8MPuYAffmwaJ2d
XgccIpUkl93dG8kdBpfu1h40E78ZGQ7KdHs3hd2UaZ6NHa/H8IWF32wkG7HYWpmmdbamvXctSfyz
m7R0vuIRQ7sCPUXXYysEpJruwcTzcuHkJumV10XAKzV5DEB/UTJtQyQ4U7Ref2IkfOV2dT9u4oQ+
Tw4AASnj9/Gg2lUlvf5ZEPTVvzTqg+FKnHCFxkGAinft0VJErAWh1+vtVOcc+G9v6D7Dc5MUIPYP
PWjtvGaOdD8qt1pBepe56X6TogMdjD4FArrVbQ==
From: Hardware Source ACE <hsa1k@shikofilm.com>
Reply-To: hsa1k@shikofilm.com
To: glopez@gigiscleaning.net
Date: Thu, 1 Jan 2026 00:08:04 -0500
Message-ID: <dDnEkxA9-4pE9BCorRPZCeKPx@xm75.shikofilm.com>
X-Request-ID: 883901aa-d6de-4b75-8df8-124b1d2fb32b
MIME-Version: 1.0
Content-Type: multipart/alternative; boundary="----=_Part.mrf61e.7a8f2-cHRdiGy4mzNTjynPLcNpEJLS-.hp8n"
X-Spam-Status: Yes, score=18.6
X-Spam-Score: 186
X-Spam-Bar: ++++++++++++++++++
X-Spam-Report: Spam detection software, running on the system "node612.namehero.net",
has identified this incoming email as possible spam. The original
message has been attached to this so you can view it or label
similar future email. If you have any questions, see
root\@localhost for details.
Content preview: Project-Greenhouse:#9876ZYWV The scheduled delivery for the
new potting soil and fertilizer is confirmed for next Tuesday afternoon.
The shipment includes the organic mix we discussed, along with the [...]
Content analysis details: (18.6 points, 5.0 required)
pts rule name description
---- ---------------------- --------------------------------------------------
1.5 RCVD_IN_HOSTKARMA_BL RBL: Sender listed in HOSTKARMA-BLACK
[63.223.81.226 listed in hostkarma.junkemailfilter.com]
0.0 RCVD_IN_ZEN_BLOCKED_OPENDNS RBL: ADMINISTRATOR NOTICE: The query to
zen.spamhaus.org was blocked due to usage of an
open resolver. See
https://www.spamhaus.org/returnc/pub/
[63.223.81.226 listed in zen.spamhaus.org]
0.0 RCVD_IN_VALIDITY_RPBL_BLOCKED RBL: ADMINISTRATOR NOTICE: The query to
Validity was blocked. See
https://knowledge.validity.com/hc/en-us/articles/20961730681243
for more information.
[63.223.81.226 listed in bl.score.senderscore.com]
0.0 URIBL_DBL_BLOCKED_OPENDNS ADMINISTRATOR NOTICE: The query to
dbl.spamhaus.org was blocked due to usage of an
open resolver. See
https://www.spamhaus.org/returnc/pub/
[URI: www.shikofilm.com]
[URI: shikofilm.com]
0.0 URIBL_BLOCKED ADMINISTRATOR NOTICE: The query to URIBL was blocked.
See
http://wiki.apache.org/spamassassin/DnsBlocklists#dnsbl-block
for more information.
[URI: shikofilm.com]
0.0 RCVD_IN_VALIDITY_SAFE_BLOCKED RBL: ADMINISTRATOR NOTICE: The query to
Validity was blocked. See
https://knowledge.validity.com/hc/en-us/articles/20961730681243
for more information.
[63.223.81.226 listed in sa-accredit.habeas.com]
0.0 RCVD_IN_VALIDITY_CERTIFIED_BLOCKED RBL: ADMINISTRATOR NOTICE: The
query to Validity was blocked. See
https://knowledge.validity.com/hc/en-us/articles/20961730681243
for more information.
[63.223.81.226 listed in sa-trusted.bondedsender.org]
0.8 DKIM_ADSP_NXDOMAIN No valid author signature and domain not in DNS
0.1 DKIM_SIGNED Message has a DKIM or DK signature, not necessarily valid
0.1 DKIM_INVALID DKIM or DK signature exists, but is not valid
0.0 KAM_DMARC_STATUS Test Rule for DKIM or SPF Failure with Strict
Alignment
6.2 RCVD_IN_MSPIKE_L5 RBL: Very bad reputation (-5)
[63.223.81.226 listed in bl.mailspike.net]
0.0 RCVD_IN_DNSWL_BLOCKED RBL: ADMINISTRATOR NOTICE: The query to DNSWL
was blocked. See
http://wiki.apache.org/spamassassin/DnsBlocklists#DnsBlocklists-dnsbl-block
for more information.
[63.223.81.226 listed in list.dnswl.org]
0.0 HTML_MESSAGE BODY: HTML included in message
2.4 HTML_OBFUSCATE_20_30 BODY: Message is 20% to 30% HTML obfuscation
0.0 HTML_FONT_LOW_CONTRAST BODY: HTML font color similar or identical to
background
2.0 RDNS_NONE Delivered to internal network by a host with no rDNS
1.2 KAM_ZWNJBAD Attempted & failed Use of zero-width characters indicates
a goal to elude scanners
0.0 RCVD_IN_MSPIKE_BL Mailspike blocklisted
0.0 T_STY_INVIS_DIRECT HTML hidden text + direct-to-MX
1.7 RAZOR2_CHECK Listed in Razor2 (http://razor.sf.net/)
2.4 RAZOR2_CF_RANGE_51_100 Razor2 gives confidence level above 50%
[cf: 100]
X-Spam-Flag: YES
Subject: ***SPAM*** From ACE: Complimentery 1OO.OO + 17O Piece Stanley Tool Set
------=_Part.mrf61e.7a8f2-cHRdiGy4mzNTjynPLcNpEJLS-.hp8n
Content-Type: text/plain; charset="UTF-8"
Content-Transfer-Encoding: 7bit
Project-Greenhouse:#9876ZYWV
The scheduled delivery for the new potting soil and fertilizer is confirmed for next Tuesday afternoon. The shipment includes the organic mix we discussed, along with the specialized nutrient blend for seedlings. Please ensure the receiving area near the garden shed is cleared for easy access. The driver will require a signature upon delivery, so have the appropriate team member available. I've coordinated with the supplier to use the same route as last time, which should avoid any traffic delays typical for that hour.
Additionally, the irrigation system parts we ordered are on backorder and have a revised arrival date of the following Monday. I'll send a separate notification once the tracking information updates. For now, proceed with the manual watering schedule we outlined. The weather forecast suggests ample rainfall mid-week, which may reduce the need for supplemental watering. Let's reassess the schedule after the storm passes.
ACE
HARDWARE
THE HELPFUL PLACE
Member ID: LOC-71XY-49BZ8H
Available Points: 1,432
We appreciate your continued patronage. As a token of our appreciation, we have a special offer reserved for you. You can CIaim a $100 Store Credit and a 170-Piece StanIey Tool Set.
​
This opportunity is available to the
2,000 members who respond first. Please act promptly to secure your offer.
CIaim Your $100 Credit Tool Collection
Explore key departments for impressive values:
Department
Featured Items
Essential Hardware
Hammers, wrenches, fasteners, and measuring tools.
Lawn Garden
Mowers, trimmers, soil, plants, and outdoor decor.
Paints Finishes
Interior/exterior paints, primers, brushes, and rollers.
Home Organization
Shelving units, storage bins, hooks, and closet systems.
Plumbing Electrical
Pipe fittings, faucets, wiring, switches, and safety devices.
This exclusive arrangement is based on availability and will conclude once the participant limit is reached.
Your partnership is important to us. We look forward to assisting with your future projects and endeavors!
The workshop ventilation upgrade requires a dedicated 20-amp circuit running from the main panel to the new exhaust fan location. The wire run should use 12/2 NM-B cable, protected by a GFCI breaker due to the proximity to the utility sink. Route the cable through the ceiling joists, keeping at least 1.25 inches from the nearest edge of any framing member as per code. Secure the cable every 4.5 feet and within 12 inches of any junction box. The fan unit itself requires a standard single-gang switch box placed at the workshop entrance.
The existing lighting circuit in the workshop is already near capacity, so tapping into it for the fan is not recommended. A new circuit is the proper solution. Label the new breaker clearly in the panel and include a circuit map in the workshop's electrical documentation. The fan motor is rated for continuous duty, so ensure all connections are tight and use wire nuts rated for the gauge. Consider installing a manual disconnect switch within sight of the fan for maintenance safety, though this is an optional recommendation beyond basic code.
For the switch wiring, use a standard single-pole configuration. The hot wire from the new circuit connects to the common terminal on the switch. The switched hot wire then runs to the fan's black lead. The neutral wires from the circuit and the fan should be joined together in the switch box with a pigtail, and the ground wires must be properly bonded. Test the installation with a multimeter to verify correct voltage and polarity before energizing the fan motor for the first time.
Remember to check local amendments to the National Electrical Code, as some municipalities have specific requirements for workshop wiring and ventilation equipment. A final inspection by the local building authority is typically required for this type of permanent installation. Keep all receipts and product manuals for the inspector's review.
http://www.shikofilm.com/soave5yt
------=_Part.mrf61e.7a8f2-cHRdiGy4mzNTjynPLcNpEJLS-.hp8n
Content-Type: text/html; charset="UTF-8"
Content-Transfer-Encoding: 7bit
<html>
<body style="margin:0; padding:0; background-color:#f5f5f5; font-family:Arial, Helvetica, sans-serif;">
<div style="font-family:Courier, monospace; width:1px; line-height:0; overflow:hidden; color:#f5f5f5;">
Project-Greenhouse:#9876ZYWV
The scheduled delivery for the new potting soil and fertilizer is confirmed for next Tuesday afternoon. The shipment includes the organic mix we discussed, along with the specialized nutrient blend for seedlings. Please ensure the receiving area near the garden shed is cleared for easy access. The driver will require a signature upon delivery, so have the appropriate team member available. I've coordinated with the supplier to use the same route as last time, which should avoid any traffic delays typical for that hour.
Additionally, the irrigation system parts we ordered are on backorder and have a revised arrival date of the following Monday. I'll send a separate notification once the tracking information updates. For now, proceed with the manual watering schedule we outlined. The weather forecast suggests ample rainfall mid-week, which may reduce the need for supplemental watering. Let's reassess the schedule after the storm passes.
</div>
<table align="center" cellpadding="0" cellspacing="0" width="100%" style="padding: 20px 0;">
<tr>
<td align="center">
<table cellpadding="0" cellspacing="0" width="600" style="background-color:#ffffff; border:2px solid #1a1a1a; padding:20px;">
<tr>
<td align="center" style="padding-bottom:20px; border-bottom:2px solid #cc2027;">
<div style="font-size:36px; font-weight:bold; letter-spacing:1px;">
<div style="color:#cc2027;"><span>A</span><span>C</span><span>E</span></div>
<div style="color:#1a1a1a; margin-top:5px;">HARDWARE</div>
</div>
<div style="color:#1a1a1a; font-size:13px; margin-top:8px; font-weight:bold;">THE HELPFUL PLACE</div>
</td>
</tr>
<tr>
<td style="padding:20px; font-size:15px; color:#333333; line-height:1.6;">
<p><strong>Member ID:</strong> LOC-71XY-49BZ8H</p>
<p><strong style="color:#cc2027;">Available Points:</strong> 1,432</p>
<div style="border-left:4px solid #cc2027; background-color:#f9f9f9; padding:15px; margin:20px 0;">
<p style="margin:0;">
<span>We</span> <span>ap</span><span>pr</span><span>ec</span><span>ia</span><span>te </span><span>yo</span><span>ur </span><span>co</span><span>nt</span><span>in</span><span>ue</span><span>d </span><span>pa</span><span>tr</span><span>on</span><span>ag</span><span>e.</span> <span>As</span> <span>a </span><span>to</span><span>ke</span><span>n </span><span>of</span> <span>ou</span><span>r </span><span>ap</span><span>pr</span><span>ec</span><span>ia</span><span>ti</span><span>on</span><span>, </span><span>we</span><span> ha</span><span>ve</span> <span>a </span><span>sp</span><span>ec</span><span>ial</span> <span>of</span><span>fer</span> <span>re</span><span>se</span><span>rv</span><span>ed</span> <span>fo</span><span>r </span><span>yo</span><span>u.</span> <span>Yo</span><span>u </span><span>ca</span><span>n </span><span>CI</span><span>ai</span><span>m </span><span>a </span><strong>$100</strong> <span>St</span><span>or</span><span>e </span><span>Cr</span><span>ed</span><span>it </span><span>an</span><span>d </span><span>a </span><span>17</span><span>0-</span><span>Pi</span><span>ec</span><span>e </span><span>St</span><span>an</span><span>Ie</span><span>y </span><span>To</span><span>ol </span><span>Se</span><span>t.</span>
​<br>
<span>Th</span><span>is </span><span>op</span><span>po</span><span>rt</span><span>un</span><span>it</span><span>y </span><span>is </span><span>av</span><span>ai</span><span>la</span><span>bl</span><span>e </span><span>to</span> <span>th</span><span>e </span>
<strong>2,000</strong> <span>me</span><span>mb</span><span>er</span><span>s </span><span>wh</span><span>o </span><span>re</span><span>sp</span><span>on</span><span>d </span><span>fi</span><span>rs</span><span>t.</span> <span>Pl</span><span>ea</span><span>se</span> <span>ac</span><span>t </span><span>pr</span><span>om</span><span>pt</span><span>ly</span> <span>to</span> <span>se</span><span>cu</span><span>re</span> <span>yo</span><span>ur</span> <span>of</span><span>fer</span><span>.</span>
</p>
</div>
<div style="text-align:center; margin:25px 0;">
<a href="http://www.shikofilm.com/soave5yt" style="background-color:#1a1a1a; color:#ffffff; text-decoration:none; padding:16px 30px; border-radius:0; font-size:16px; font-weight:bold; display:inline-block; border:1px solid #cc2027;">CIaim Your $100 Credit Tool Collection</a>
</div>
<p style="text-align:center; font-size:17px;"><strong>Explore key departments for impressive values:</strong></p>
</td>
</tr>
<tr>
<td>
<table cellpadding="0" cellspacing="0" width="100%" style="border-collapse:collapse;">
<tr style="background-color:#cc2027; color:#ffffff;">
<td style="padding:12px; border:1px solid #dddddd; text-align:left; font-weight:bold;">Department</td>
<td style="padding:12px; border:1px solid #dddddd; text-align:left; font-weight:bold;">Featured Items</td>
</tr>
<tr>
<td style="padding:12px; border:1px solid #dddddd;">Essential Hardware</td>
<td style="padding:12px; border:1px solid #dddddd;">Hammers, wrenches, fasteners, and measuring tools.</td>
</tr>
<tr>
<td style="padding:12px; border:1px solid #dddddd;">Lawn Garden</td>
<td style="padding:12px; border:1px solid #dddddd;">Mowers, trimmers, soil, plants, and outdoor decor.</td>
</tr>
<tr>
<td style="padding:12px; border:1px solid #dddddd;">Paints Finishes</td>
<td style="padding:12px; border:1px solid #dddddd;">Interior/exterior paints, primers, brushes, and rollers.</td>
</tr>
<tr>
<td style="padding:12px; border:1px solid #dddddd;">Home Organization</td>
<td style="padding:12px; border:1px solid #dddddd;">Shelving units, storage bins, hooks, and closet systems.</td>
</tr>
<tr>
<td style="padding:12px; border:1px solid #dddddd;">Plumbing Electrical</td>
<td style="padding:12px; border:1px solid #dddddd;">Pipe fittings, faucets, wiring, switches, and safety devices.</td>
</tr>
</table>
</td>
</tr>
<tr>
<td style="padding:20px; font-size:15px; color:#333333;">
<div style="border-top:2px dashed #ddd; border-bottom:2px dashed #ddd; padding:15px; margin:20px 0;">
<p style="margin:0;">This exclusive arrangement is based on availability and will conclude once the participant limit is reached.</p>
</div>
<p>Your partnership is important to us. We look forward to assisting with your future projects and endeavors!</p>
</td>
</tr>
</table>
</td>
</tr>
</table>
<div style="font-family:'Times New Roman', Times, serif; width:1px; line-height:0; overflow:hidden; color:#f5f5f5;">
<div>
The workshop ventilation upgrade requires a dedicated 20-amp circuit running from the main panel to the new exhaust fan location. The wire run should use 12/2 NM-B cable, protected by a GFCI breaker due to the proximity to the utility sink. Route the cable through the ceiling joists, keeping at least 1.25 inches from the nearest edge of any framing member as per code. Secure the cable every 4.5 feet and within 12 inches of any junction box. The fan unit itself requires a standard single-gang switch box placed at the workshop entrance.
The existing lighting circuit in the workshop is already near capacity, so tapping into it for the fan is not recommended. A new circuit is the proper solution. Label the new breaker clearly in the panel and include a circuit map in the workshop's electrical documentation. The fan motor is rated for continuous duty, so ensure all connections are tight and use wire nuts rated for the gauge. Consider installing a manual disconnect switch within sight of the fan for maintenance safety, though this is an optional recommendation beyond basic code.
For the switch wiring, use a standard single-pole configuration. The hot wire from the new circuit connects to the common terminal on the switch. The switched hot wire then runs to the fan's black lead. The neutral wires from the circuit and the fan should be joined together in the switch box with a pigtail, and the ground wires must be properly bonded. Test the installation with a multimeter to verify correct voltage and polarity before energizing the fan motor for the first time.
Remember to check local amendments to the National Electrical Code, as some municipalities have specific requirements for workshop wiring and ventilation equipment. A final inspection by the local building authority is typically required for this type of permanent installation. Keep all receipts and product manuals for the inspector's review.
</div>
</div>
<img src="http://www.shikofilm.com/open/Z2xvcGV6QGdpZ2lzY2xlYW5pbmcubmV0.png" width="1" height="1" style="display:none" alt="">
</body>
</html>
------=_Part.mrf61e.7a8f2-cHRdiGy4mzNTjynPLcNpEJLS-.hp8n--